3.3
Fig. 2
© Martin Engineering GmbH
Functional sequence
1. The air cannon tanks (1, Fig.2) are loaded to a maximum
pressure of 10 bar by filling with air (2, Fig. 2).
2. The filling process is completed when the pressure in the air
canon tank reaches the pressure level of the supply line.
3. The air cannon is ready to operate.
13
1
2
M3727UK-09/15