Inspection tasks
1.
Check general state of system
2.
Visual inspection and function check of system
3.
Check gas- and water-bearing components for
- leaks
- signs of corrosion
- signs of ageing
4.
Take system out of service and check the burner, heat exchanger
and siphon for signs of dirt and soiling.
(see subsection 3.2.3 on page 32)
5.
Check the burner, hot surface ignitor and ionisation electrode,
after disconnecting the system.
(see subsection 3.2.3 on page 32)
6.
Measuring the ionisation current
(see subsection 2.1.11 on page 30)
7.
Measure the gas connection pressure (flow pressure)
8.
Check the gas-air ratio
(see subsection 2.1.8 on page 29)
9.
Gas leak test in operational condition
(see subsection 2.1.10 on page 30)
10. Measure the carbon monoxide content (CO), vacuum
11. Pressure-testing of heating system:
- admission pressure of expansion vessel
(see installation instructions supplied with expansion tank)
- Filling pressure
12. Check ventilation and exhaust conduits for correct functioning and
safety
13. Check requirement-related adjustment settings of control device
(see documentation supplied with control device)
14. Final check of inspection tasks,
with record kept of measurement readings and test results
15. Confirm inspection carried out by qualified service engineer
and fill out the Benchmark
Company stamp / Date / Signature)
Subject to modifications resulting from technical improvements!
66
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
Please check off the inspection and/or requirement-related
maintenance tasks carried out and enter the corresponding
readings.
Sign details of inspection and maintenance tasks,
indicating date carried out.
Use only original replacement parts.
Date: _____________
_________________ µA
________________ mbar
_________________ Pa
________________ ppm
________________ mbar
________________ mbar
Boulter Buderus Ltd. • http://www.boulter-boilers.com
Date: _____________
_________________ µA
________________ mbar
_________________ Pa
________________ ppm
________________ mbar
________________ mbar

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark 600 series

Table of Contents