Initial Start-Up; Preparing The Boiler For Operation - Boulter Buderus Benchmark 600-28C Installation And Servicing Instruction

Wall-mounted condensing gas boiler
Table of Contents

Advertisement

Initial start-up

2
Initial start-up
Fill out the protocol listed in subsection 7.1 during the initial
start-up.
2.1

Preparing the boiler for operation

CAUTION
DO NOT operate the condensing gas boiler if
large amounts of dust are present, e.g. due to
building work in and around the place of instal-
lation.
2.1.1
Fill the heating system
WARNING
The wall-mounted condensing gas boiler must
not be activated at this stage.
NOTE
The boiler will not start up until the system
pressure is greater than 0.2 bar.
Remove the ventilation cover (fig. 27).
Adjust the knobs for central heating (fig. 28, item 1) and
domestic hot water (fig. 28, item 2) to '0'.
Subject to modifications resulting from technical improvements!
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
1
1
fig. 27 Remove ventilation cover
2
3
fig. 28 Control panel
Boulter Buderus Ltd. • http://www.boulter-boilers.com
2