Reports; Start-Up Report - Boulter Buderus Benchmark 600-28C Installation And Servicing Instruction

Wall-mounted condensing gas boiler
Table of Contents

Advertisement

Reports

7
Reports
7.1

Start-up report

Please check off the start-up tasks carried out and enter
the corresponding readings.
Initial start-up tasks
1.
Note down gas characteristics:
Wobbe-index
Operating heat value
2.
Inspect to check for leaks
(see subsection 2.1.4 on page 26)
3.
Check combustion air/flue gas connection
(see subsection 3.2.2 on page 32)
4.
Checking the boiler equipment (change to another type of gas if
necessary) (see subsection 2.1.5 on page 27)
5.
Carry out adjustment settings
(see subsection 2.1.6 on page 27)
6.
Measure the gas connection pressure (flow pressure)
(see subsection 2.1.7 on page 27)
7.
Checking and adjusting the gas/air -ratio
CO
-content:
at full load
2
at part load
(see subsection 2.1.8 on page 29)
8.
Leak test in operational condition
(see subsection 2.1.10 on page 30)
9.
Measure carbon monoxide content (CO), vacuum
10. Function testing
Measuring the ionisation current
(see subsection 2.1.11 on page 30)
11. Fit the boiler casing
12. Instruct the user. Fill in Benchmark log book.
Hand over documentation (see subsection 2.1.12 on page 31)
13. Confirm initial start-up
Confirmation of initial start-up by qualified service technician
(Company stamp, signature)
Subject to modifications resulting from technical improvements!
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
Remarks or measurement readings
_____________________ kWh/m
_____________________ kWh/m
_____________________ mbar
_____________________ Pa
_____________________ %
_____________________ %
_____________________ ppm
_____________________ µA
Boulter Buderus Ltd. • http://www.boulter-boilers.com
7
3
3
65

Advertisement

Table of Contents
loading

This manual is also suitable for:

Benchmark 600 series

Table of Contents