Install The Equipment Modules And Batteries - Eaton BladeUPS Series Dos Installation Instructions

Table of Contents

Advertisement

Section 7

Install the Equipment Modules and Batteries

To install the EMs and batteries in the BladeUPS modules:
Note:
Always remove batteries first, before replacing or removing EM.
1.
Hold the first EM horizontally and insert it tabs up, fan side first, into the bottom EM bay of the cabinet.
Replace the holding screw that secures the EM in the frame mounting hole of the cabinet.
2.
Repeat to install the EM in the top EM bay of the cabinet.
3.
Locate and unpack the battery packs.
Note:
Always install the batteries in the bottom bays first, then install them in the top bays.
4.
Hold the battery packs horizontally with the connector end positioned ready to insert into the open battery
bay.
5.
Align the battery slots on the chassis with the shape of the battery pack. Insert the battery pack with the
connector end in first.
6.
When a tray is fully installed, tuck the plastic handle on the end of the tray into place.
7 .
Reinstall the battery cover plates. Secure them with the screws you retained, four on the left and four on
the right of each plate (see Figure 13).
Figure 13. Reinstall Battery Covers
Eaton BladeUPS DoS Installation Instructions P-164000613—Rev 3
11

Advertisement

Table of Contents
loading

Table of Contents