Grouping Mcu-004 And Mcu-005; Mcu-004 - Furuno MCU-002 Manual

Remote control units
Hide thumbs Also See for MCU-002:
Table of Contents

Advertisement

5. Grouping MCU-004 and MCU-005

With one (1) MCU-004 connected to one of the displays or one (1) MCU-005 networked in the Ethernet, the
controllable display can be switched in the network.
Note:
The MCU-004 works with both NavNet TZtouch (TZT9/14/BB) and TZtouch2 (TZTL12F/15F/2BB), and the
MCU-005 with NavNet TZtouch2 (TZTL12F/15F/2BB) only. When the MCU-005 is installed in the integrated
network of NavNet TZtouch and TZtouch2 MFDs, the MCU-005 controlls the TZTL12F/15F/2BB only.

5.1. MCU-004

As an example, displays at the main bridge and fly bridge should be operated independently. In this case, displays should
be separated in two (2) groups. In the following example, a total of four (4) sets of TZTL12F/15F displays are installed
at the main and fly bridges and networked with each other. One each of MCU-004 is connected to the TZTL12F/15F at
both bridges. The MCU-004 at the fly bridge will be set to control the displays at the fly bridge, while the MCU-004 at the
main bridge will be set to control the displays at the main bridge.
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcu-005Mcu-004

Table of Contents