Gate Operator Installation Checklist

1.
The gate has been checked to make sure it is level and moves freely in both directions.
2.
Potential pinch areas have been guarded so as to be inaccessible OR have sensing edges and/or photo
beam obstruction detection devices installed.
3.
The installer has installed one or more contact or non-contact obstruction sensing devices, if required for
this installation.
4.
If pedestrian traffic is expected, a separate pedestrian gate has been installed, a minimum of seven feet
from the gate system. All pedestrian traffic must use the pedestrian gate.
5.
Warning signs have been installed on each side of the gate in highly visible locations. These signs must
remain at all times.
6.
There are no controls installed on the gate operator, or within 10 feet of the gate.
7.
The Dual Sense Technology™ feature has been properly adjusted to the minimum operational setting for
your application.
8.
Reviewed and understand all of the operational functions, obstruction sensing devices, warning beeper
and reset, etc.
9.
Review and understand the proper use of the operator's manual disconnect feature. The manual
disconnect must never be used while the gate is in motion. The power switch must be turned off before
using the manual disconnect and disengaging the operator.
10. Reviewed all safety instructions, and keep the safety instructions and owner's information sheets for
reference.
11. Review and understand the maintenance schedule for both the gate and the gate operator.