TRANSFORMER OR SOLAR PANEL WIRING INSTALLATION
Step 3
Operator Arm Cable/Power Access
● Feed the transformer or solar panel wires into the control box using one of the access locations on the bottom of the box.
● Connect the RED wire to PWR+ and the BLACK wire to PWR- on TERM 6 as shown.
Step 3B (MM572 Only)
Second gate opener
● Cut a 6" deep slot into the driveway to accommodate PVC conduit (not provided) for the power cable coming from the
Second opener to the control box. The buried conduit will protect the 32 foot power cable from automobile tires, lawn
mower blades, weed eaters, and grazing animals.
● Pull the secondary operator cable through the conduit.
● Repeat steps 1-3 above for connecting the SECONDARY operator cable to the control board.
TERM6
BAT+
BAT–
SW1
SW2
Run PVC conduit (not included) under driveway to protect
second opener power cable and low voltage wire.
1 2 3 4 5
1 2 3 4 5
RESET
RESET
AUTO
AUTO
CLOSE
CLOSE
TERM6
BAT+
BAT–
SW1
LOCK
AUX
SW2
Alternate Access
Master gate opener
MM571W / MM572W Installation Instructions
19