INSTALLATION OF VACON NX DEVICENET OPTION BOARD
5.
INSTALLATION OF VACON NX DEVICENET OPTION BOARD
NOTE! These instructions apply only to field installations. Otherwise, the board has already
been installed for you at the factory.
!
MAKE SURE THAT THE FREQUENCY CONVERTER IS SWITCHED OFF BEFORE
AN OPTION OR FIELDBUS BOARD IS CHANGED OR ADDED!
NOTE
Before taking any commissioning actions, carefully read the safety instructions in Vacon NX User's
Manual, Chapter 1.
A
Vacon NX frequency converter
B
Remove the cable cover.
24-hour support +358 (0)40 837 1150 • Email: vacon@vacon.com
vacon • 11