Creating a project and substation in DIGSI 4
The new project in DIGSI 4 with substation files, feeder files and protection devices may be de-
archived from an archived substation or be newly created.
The procedure is described in the „SIPROTEC System Manual".
Before the necessary settings for remote control are done, the local connection to all protection
devices via the central interface (e.g. at the LAN connection of the ISDN router) must be tested (see
Figure 1).
Please also note the detailed application examples for the structure of a local subnet in the EN100
manual under:
www.SIPROTEC.com
Note:
All devices require an EN100-system interface
Each device must have a unique IP-address.
HELP_DIG48_SIP4_INSYS_MOROS_ISDN_EN100_EN1.DOC
/ Prot. Devices / General Information / Communication.
Seite 3 von 25
Power Transmission and Distribution
Energy Automation
27.08.2008