Leaf Module Leds - Intel Omni-Path Switch 100 Series Installation Manual

Table of Contents

Advertisement

®
Installation—Intel
Omni-Path Fabric
Service (SVC)
The Chassis Service (SVC) LED indicates the following condition:
Green: Chassis beacon is active
Off: Not selected
Master
Green: the module is acting as the master Management Module
Off: Management Module is not the Master
MRL Active
Green: the mechanical release latch (MRL) thumbscrew is secured to the
management module, enabling communications with a mated management leaf
module
Off: the mechanical release latch (MRL) thumbscrew is not engaged, disabling
communications with a mated management leaf module
2.8.2.2

Leaf Module LEDs

Figure 66.
Leaf Module LEDs
Port LEDs
Green: The external HFI link is in the Active Port State
Off: Link is not active
Module Status
The status LED indicates one of the following conditions:
Steady Green: the module is operating normally.
Blinking Green: LED test state.
Off: module is in the removable state.
Module Attention
The Attention LED indicates one of the following conditions:
June 2019
Doc. No.: H76456, Rev.: 10.0
®
Intel
Omni-Path Fabric Switches Hardware
Installation Guide
81

Advertisement

Table of Contents
loading

Table of Contents