®
Installation—Intel
Omni-Path Fabric
Figure 25.
Q7 Module Mounting Screw
4. Reattach the switch cover.
NOTE
For information on upgrading Q7 board controller firmware (BCFW) and BIOS, refer to
Q7 BIOS Update
®
2.4
Intel
Installation
2.4.1
Mounting Hardware Kit Contents
The Mounting Kit contains:
•
Support Shelf (1)
•
Baffles (2)
•
#10 Mounting screws
•
#10 Mounting nuts
•
M6 Mounting Screws
2.4.2
Unpacking the Switch
NOTE
Set aside packaging materials in the event that the switch requires return shipment.
The following images and descriptions give a high-level overview for unpacking a
Director Switch (24-slot model in this example).
June 2019
Doc. No.: H76456, Rev.: 10.0
on page 86.
Omni-Path Director Class Switch 100 Series
®
Intel
Omni-Path Fabric Switches Hardware
Installation Guide
45