Download Print this page

Foley United 6181SRI Operator's Manual page 37

Auto - index spin / relief reel mower grinder

Advertisement

GRINDING REEL INTO A TRUE CYLINDER BY
SPIN GRINDING
1. This grinder is equiped with two grinding
wheels and two grinding wheel guards. Prior
to spin grinding install or verify installation
of the 1" (25 MM) wide grinding wheel and
the spin wheel guard which has no fingers
attached. See FIG. 64.
2. Before you proceed any further, check
all knobs to insure they are tight.
FIRMLY TIGHTEN ALL LOCKING KNOBS
BEFORE GRINDING. ANY LOOSENESS
WILLADVERSELY AFFECT GRIND QUALITY.
There are three (3) lock handles for locking
the grinding wheel vertically. Two (2) on the
base for the adjusting arm locks and one for
grinding wheel vertical height adjustment
locking screw. See FIG. 65.
3. Position the height of the grinding wheel
center so that it is 0 to 1" below the reel
center. See FIG. 66.
4. Infeed the grinding wheel until it just makes
contact with a reel blade while rotating the
reel by hand. Now tighten the two locking
knobs on the locking arms and the locking
knob for the height adjustment screw. Back
the grinding wheel off so it just clears the reel.
OPERATING INSTRUCTIONS
LOCK HANDLE
ADJUSTING ARMS
(1) EACH SIDE
37
FIG. 64
FIG. 65
LOCK HANDLE
VERTICAL
ADJUSTMENT LOCK
0" to 1"
FIG. 66

Advertisement

loading