Download Print this page

Foley United 6181SRI Operator's Manual page 13

Auto - index spin / relief reel mower grinder

Advertisement

120 Volt Model Only. Plug the control box power cord into a
standard 120V AC 15-amp grounded receptacle. See FIG. 9.
WHEN INSTALLING THE GRINDER, THE FOLLOWING
GUIDELINES SHOULD BE USED TO ESTABLISH THE WIRE SIZE
BETWEEN THE POWER PLANEL IN YOUR BUILDING AND THE
GRINDER RECEPTALE. NOTE THAT THE WIRING IN YOUR
BUILDING MUST BE PER CODE BETWEEN THE MAIN POWER
PANEL AND SUB PANELS.
220 V 50/60Hz MODEL
220 V machines are installed
with a 2 KVA 220 Volt Step Down
transformer which is used to
convert the power deliver to the
electrical control to 110 VAC.
The transformer wiring diagram is
shown in FIG. 10.
A connector which is appropriate
for your locality and 220 volt, 8
amp application should be
installed if there is not one
already on the end of the main
power cord.
USE ONLY A QUALIFIED
ELECTRICIAN TO COMPLETE THE
INSTALLATION.
FOR 15 AMP RATED LARGE MACHINES
For 0 to 30 Feet from panel to receptacle = Use 14 Ga. Wire.
For 30 to 50 Feet from panel to receptacle = Use 12 Ga. Wire.
For 50 to 80 Feet from panel to receptacle = Use 10 Ga. Wire.
For 80 to 140 Feet from panel to receptacle = Use 8 Ga. Wire.
For 0 to 15 Meters from panel to receptacle = Use 2.5mm Wire.
For 15 to 42 Meters from panel to receptacle = Use 4.0mm Wire.
POWER OUT
110V, 1PHASE
BROWN
LIGHT BLUE
NEUTRAL
INDIVIDUALLY WIRE NUT TRANSFORMER LEADS H2, H3, H4, H7, H8
AND H9.
INSTALL THE GREEN WITH YELLOW STRIPE WIRE SUPPLIED
INTO THE TERMINAL BLOCK IN THE HOLE OPPOSITE WIRE X3 AS
SHOWN. TO INSTALL THE WIRE INSERT A SMALL SCREWDRIVER
INTO THE CAVITY MARKED "A" TO OPEN THE WIRE HOLE.
ATTACH THE OTHER END OF THE GREEN WITH YELLOW STRIPE
WIRE SUPPLIED TO THE GROUND STUD ON THE TRANSFORMER.
13
INSTALLATION INSTRUCTIONS
14 G. (2.5MM) GREEN
WITH YELLOW STRIPE
GROUNDWIRE TO BE
ADDED.
120 VAC 15A
STANDARD PLUG FOR
NORTH AMERICA.
FIG. 9
GREEN WITH
YELLOW STRIPE
GROUND WIRE
POWER IN
220V, 1PHASE
BROWN
LIGHT BLUE
NEUTRAL
FIG. 10

Advertisement

loading