Estimated Installation Time
The estimated installation time is an approximate time based on a trained
technician completing the installation.
• Included in the installation time is the following:
o
o
• Excluded in the installation time is the following:
o
o
o
o
The following chart includes the estimated installation times based on the
above conditions for installing the copier and optional items:
CLC 5100/4000
RDF-E3
Buffer Pass Unit-D1
Side Paper Deck-R1
F.
Power and Plug Requirements
The CLC 5100/4000 power requirements, as compared with the CLC
5000/5000+/3900/3900+, have been changed from one high-voltage
receptacle (20AMP, 208V) to two NEMA 6-15R receptacles (15AMP,
208V) for proper operation.
changed to reflect this. See Figure 1 for the NEMA diagram. Confirm
that two NEMA 6-15R receptacles are available prior to installation.
12
Excludes unpacking, unloading the machine from skid, and moving the machine to the site.
13
A minimum of two people required to safely unpack and install the Paper Deck-R1.
CLC 5100/4000 Service Guide
Trained Technicians
Necessary adjustments
Power outlet preparation
Unpacking the main unit and/or options
Network environment setup
Installation space preparation
Description
12
13
The electrical plug shape has been
Figure 1
NEMA 6-15R
Rev. 0
CLC 5100/4000 Service Guide
Estimated Installation Time
Approximately 90 minutes
Approximately 30 minutes
Approximately 20 minutes
Approximately 25 minutes
October 2003 Page 10