Booting The Switch 7750 - 3Com 3C16895 Installation Manual

3c16895 7-slot chassis 3c16894 4-slot chassis and associated modules
Hide thumbs Also See for 3C16895:
Table of Contents

Advertisement

48
C
3: C
HAPTER
ONFIGURING THE
Booting the Switch
7750
S
7750
WITCH
Figure 36 Settings Tab
Before powering on the Switch 7750, verify that:
Power cords have been properly connected.
The voltage of power supply can meet the requirements on the switch.
The console cable has been connected properly.
The PC or terminal for configuration has been started.
The terminal parameters have been set.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3C16895 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

77503c16894

Table of Contents