Assembling The Rolling-Contact Bearings; Figure 9-2 Disassembling The Labyrinth Sealing Ring (Schematic Diagram) - Siemens SIMOTICS TN N-compact 1LH8 Operating Instructions & Installation Instructions

Low-voltage motor
Table of Contents

Advertisement

Figure 9-2
1. Mark the components of the bearing units so that they can be assembled correctly.
2. Remove the protective coating from the shaft in front of the Iabyrinth sealing ring.
3. Unscrew the three radially arranged set screws for fixing the ring axially.
4. Screw suitable bolts or screws into the radial threads for pulling off. Note the length of
5. Warm the labyrinth sealing ring as you pull it off.
See also
Installing the labyrinth sealing ring (Page 110)
9.2.4.4

Assembling the rolling-contact bearings

● Extreme caution and attention to cleanliness are vital to installation. Observe the correct
● Attach all components with the specified tightening torques (Page 131).
Procedure
1. Remove the required components and replace damaged components.
2. Remove any dirt from the components. Remove any grease and the remains of sealant or
SIMOTICS TN Series N-compact 1LH8
Operating Instructions 06/2017
Disassembling the labyrinth sealing ring (schematic diagram)
engagement to avoid clamping to the shaft or damaging the thread.
assembly sequence of the components.
Note
For further information about mounting the roller bearing, please refer to the catalog or the
information provided by the roller bearing manufacturer.
liquid threadlocker.
Maintenance
9.2 Corrective Maintenance
107

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simotics tn n-compact series1pq8Simotics tn series

Table of Contents