ABB Relion 630 Series Operation Manual page 90

Power management, compact load-shedding solution
Hide thumbs Also See for Relion 630 Series:
Table of Contents

Advertisement

Section 4
Using the HMI
82
GUID-C259AE91-9FFB-43E0-B139-CB5D51B180CB V1 EN
Figure 75:
Grid connected peer station (area) far-end data
On operation of a circuit breaker associated with a power source, fast load-
shedding module is initiated and results in load-shedding due to a shortage of
power in Subnetwork1.
GUID-A1E9F1A6-66A9-473E-8BB1-83DFC94C0000 V2 EN
Figure 76:
Power shortage
5.
Click Control Panel to open the Manual LS/LS command reset control
dialog box which gives the status of the load-shedding action.
1MRS757183 F
PML630/Compact Load-Shedding Solution
Operation Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion pml630

Table of Contents