SolarMax MaxWeb XPN Installation Instructions Manual page 37

Table of Contents

Advertisement

Fig. 23: Alarm during energy comparison
In the "Energy comparison" menu, you can compare the relative daily yields of all inverters.
The relative daily yield is calculated from the installed capacity and the daily yield. If the
relative yield of one or more inverters falls short of the mean value of all inverters by more
than the specified tolerance, an alarm is triggered.
Note
For accurate energy comparison, it is important to correctly set the installed
capacity for each device.
The following settings can be made for energy comparison:
Activ:
Time:
Deviation:
Then click on the Next button to finish the wizard. Now you can see the following screen:
Fig. 24: Finishing the configuration wizard
Tick this option to carry out an energy comparison.
Enter a time at which the energy comparison is to be carried out on a
daily basis.
Enter the tolerance for the deviation of the energy values of the
inverters in percent.
en
37

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MaxWeb XPN and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF