6.
INSTALLATION OF HEATING COMPONENTS
A) Single resistance platinum shielded (9Kw - 15Kw - 30Kw)
Duct for
thermostat
centre
5
___________________________________________________________________________
B) Multi-resistance platinum shielded (45Kw - 60Kw)
Duct for
thermostat
sensor
5
EN
ASSEMBLY DIAGRAM
0
1
4 3 2
ASSEMBLY DIAGRAM
0
1
4 3 2 5
4 3 2
15
Recommended order of assembly
0 -
Assembly of the flange
with tightening to 3dN
1 -
Installation of M10Pins
2 -
Installation of the seal
3 -
Installation of the
resistance (NB loop
downwards for 15 & 30
Kw model)
4 -
1 backflange (model 15 &
30 Kw)
5 -
6 M10 bolts
Recommended order of assembly
0 -
Assembly of the flange
with tightening to 3dN
1 -
Installation of Pins M10
2 -
Installation of seal
3 -
Installation of resistance
(NB loop downwards for
15 & 30 Kw model)
4 -
1 backflange (Model 15
& 30 Kw)
5 -
6 M10 bolts
Document ref.: 428016 03