Section 2. Installation; Introduction; Receipt Inspection; Location And Mounting - PESA RCP-48X Manual

Table of Contents

Advertisement

RCP-48X

2.1 Introduction

This section details RCP-48X installation procedures. The following topics
are discussed:

Receipt Inspection

Location and Mounting

Polling Address
Control Panel/Controller Interconnection
Power connections
2.2 Receipt Inspection
The RCP–48X was inspected and tested prior to leaving the PESA fac-
tory. Upon receipt, please inspect the unit for shipping damage. If damage
is detected, notify the carrier immediately and hold all packing material for
inspection. If assistance is required, please contact PESA Customer
Service at the telephone number listed in the front of this manual.
After unpacking, compare all parts received against the packing list. If the
unit is undamaged and all components have been received, proceed with
installation.
2.3 Location and Mounting
The RCP-48X has been designed to fit in a standard E.I.A. 19" equipment
rack and uses 1 rack unit of space (1 3/4"). An area should be selected
where temperature does not exceed 40°C inside the equipment rack, and
where air can circulate freely. The unit should be mounted in an area
convenient to control and power connections. Sufficient space must be
provided behind the rack to allow for the control and power cables. All
mounting holes should be utilized and hardware tightened securely. All
cables should be strained relieved and secured to racks or other support-
ing structures. Failure to provide adequate cable support can result in
cables separating from connectors. If cable runs are to be stored under an
elevated floor, they should be tied to the racks as a guide. If cables are
run along the floor, do not allow them to lay in the work area behind the
racks. Stepping or tripping on the cables may result in connections being
pulled free or wire breakage inside the insulation.
Installation
Section 2
2
page 2.1
INSTALLATION

Advertisement

Table of Contents
loading

Table of Contents