Chapter 2 - Installation; Shipping Damage Inspection; Unpacking; Installation Location - PESA Tiger User Manual

Pesa tiger digital video routing switcher
Hide thumbs Also See for Tiger:
Table of Contents

Advertisement

Chapter 2 – Installation

Shipping Damage Inspection

Immediately upon receipt, all shipping containers should be inspected for damage caused in transit. If any
damage is noted, save all packing material and contact both PESA and the carrier as soon as possible.

Unpacking

Carefully unpack the equipment and compare the parts received against the packing list and Table 1. If any
parts appear to be missing, please contact PESA immediately.

Installation Location

This equipment is designed to be installed in a standard 19-inch equipment rack located in an environment
conforming to the specifications shown in Chapter 1. Each unit should be located as close as possible to its
associated equipment to minimize cable runs.
Consideration should be given to the connection of this equipment to the supply circuit and the effect that
possible overloading could have on overcurrent protection circuits and supply wiring. Refer to the nameplate
ratings when addressing this concern.
Chapter 2 – Installation
Tiger Video Routing Switcher
CAUTION
This equipment contains static sensitive devices. A grounded
wrist strap and mat should be used when handling the internal
circuit cards.
WARNING
For safety reasons, this equipment must be located near the
socket-outlet or power strip so that the AC line cord plugs are
easily accessible (Ref. EN60950:1992 §1.7.2)
5

Advertisement

Table of Contents
loading

Table of Contents