Installation Into Panel - HIS -ML12 C Series User Manual

12” panel mount industrial monitor
Table of Contents

Advertisement

Installation into Panel

1. Refer to the drawing below.
2. Locate position in panel for mounting of the monitor. Ensure that there is adequate
space begin the panel. Allow extra space (0.5 in. behind and on each side) for air
ventilation.
3. Cut a rectangular hole in the panel. Clean and deburr.
Dimensions: 12.12" (308mm) W x 10.35" (263mm) H ; +/- .020"
4. Separate the rear collar from the unit by removing the 8 nuts.
5. Insert the unit into the front of the panel and re-attach the collar.
6. Tighten all 8 nuts to a torque of 24 inch-pounds to assure a water-tight seal be-
tween the poron bezel gasket on the monitor and equipment panel. HIS will not
assume liability for damage to internal electronics due to improper installation.
8

Advertisement

Table of Contents
loading

Table of Contents