Installation & Operation; Installation Of The Protective Cover; Installation Of The Mainshaft; Equipping Power Source - Talyn Plus 2 Installation & Operation Manual

Table of Contents

Advertisement

such as voltage、 frequency、 power、 phase number & full
load current, and the weight and manufacture date of
the machine.
If the B has noted in the model of the machine, it means
the machine with the protection cover. It means without
the equipment of the protection cover if without the note
of B.
2 INSTALLATION AND OPERATION
Before installation and use of the wheel balancer, you
should carefully read this installation and operation
manual. And keep this manual in hand for reference at
any time. You should be sure that all the operators have
read this manual to guarantee the most perfect
functions of the machine and meanwhile the safety.
2.1 PROTECTIVE HOOD INSTALLATION:
: shown in page 26~27
2.2 MAIN SHAFT INSTALLATION
MAINSHAFT INSTALLATION:Before installation, use
the ethyl alcohol and compressed air to clean up the
center hole of the shaft and connect part. Use spanner
and screw to fix the thread shaft on the balance shaft
(Fig2)
Fig2
2.3 ELECTRICAL CONNECTION & EARTHING
According to the label on the connection between
power cable and body, the power cable connect
socket must be grounded with the reliable earth wire.
All the electrical devices installation must be done by
the qualified staff. Before installation, please check
If the power system is comply with the technical
parameter marked on the nameplate of the machine.
The wiring of the machine must have the fuse and the
perfect ground protection. And install the electrical
Leakage automatic controls switch in the power source.
And recommend the application of the stabilizer if the
voltage of installation site is unstable.
Any electrical connect in the workshop is only done by
the qualified technical staffs and it should meet the
enforced regulation.
Any electrical connect must be according to the
following:
• Power on the data plate on the machine;
• Voltage decrease cannot exceed 4% of the rated
voltage on the data plate when full load (10% when
start)
-Operators must:
• Install the plug;
• install 30ma circuit breaker;
• install power cable fuse;
• provide with effective workshop electrical connect to
ground;
- prevent the authorized operation and pull out the plug
to prolong the working life when not use the machine.
- If the machine directly connected to the power source
through the power board not the plug, we should use
the qualified staffs to operate.
Perfect ground is necessary for the correct operation.
Do not connect the machine with air pipe, water pipe,
telephone line and the other unsuitable objects
TECHNICAL FEATURES
3.
3.1 FEATURES:
- adopts quality computer with the feature of high
intelligence and high stable
-mechanical main shaft adopts high precision bearing
4