Before Dismantling; Dismantling Pump And Motor; Dismantling The Thrust Bearing - Grundfos BMS Series Service Instructions Manual

Table of Contents

Advertisement

www.motralec.com / service-commercial@motralec.com / 01.39.97.65.10

5. Before dismantling

General information about BMS hs and BMS hp
The work site must be clean, free of salt or brine water and iron
filings. Clean the workplace with flushing water, if it is necessary.
1. If the pump is to be repaired at a service workshop, do the
following:
2. Check that the pump has not been damaged during
transportation.
3. Identify the type designation. See the pump nameplate.
4. If the repair is to be done on site before dismantling the pump,
check the installation:
– wiring connections (power supply and signals)
– hydraulic connections
– inlet and outlet pressure and flowmeter value(s), if possible
– protection: pressure switches, flow switches and motor
protection etc.
5. Compare the motor voltage and frequency details on the
motor and frequency converter nameplates with the power
supply available.
– Read and note down the trip and failure log of the frequency
converter.

5.1 Dismantling pump and motor

1. Remove the Victaulic clamp at the inlet-and outlet.
2. Remove the service connector, if it is installed.
Removing the Victualic coupling and service connector
Fig. 2
3. Remove the four M10 bolts.
Dismantling pump and motor
Fig. 3
4. Loosen the clamps and pull the pump towards the outlet port if
the pump is mounted on a base frame.
Clamps
Removing pump from motor
Fig. 4

5.2 Dismantling the thrust bearing

5. Remove the two hexagon socket head cap screws.
Loosening the hexagon socket head cap screws
Fig. 5
6. Use the screws to pull out the thrust bearing from the bearing
housing.
Removing the thrust bearing
Fig. 6
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bms hsBms hpBmsxBmst

Table of Contents