Maintenance; Inspection And Servicing - JAUDT FSV 6110 Series Translation Of The Original Operating Instructions

Vario-slide valve
Table of Contents

Advertisement

Operating Instructions FSV 6110...
5

Maintenance

Maintenance includes servicing, inspection and repairs.
Maintenance should only be carried out by JAUDT GmbH.
Servicing and inspection should only be carried out by specially trained qualified personnel.
Work on the electrical system must only be carried out by qualified electricians.
Inspection every 3 months
Servicing
every 3 months
every 6 months
Comply with the inspection and servicing intervals for vendor parts – see "Reference Documenta-
tion" (Section 1.3).
Special tools for maintenance:
You do not need any special tool beside the current tools like spanner, Allen key, screwdriver,
feeler gauge and calliper rule to maintain your JAUDT-device.
But we suggest to use a capable lifting system for heavy device parts and, if necessary, protecting
clothing.
To identify needed special tools for mounted accessories from other manufacturer please consider
their operating manual.
6

Inspection and servicing

Inspection must also be carried out as part of the servicing work.
Indicates inspection- or servicing work
© BA6110.0002_EN_Rev11.docx
Under constant working cycles or critical operating conditions
For other applications as stop slide valve
Be careful! Danger of injury!
Make sure that the equipment has been switched off before work starts and that
precautions have been taken so that it cannot start up again unintentionally. Inform
the appropriate control staff.
Be careful! Danger of injury! – When substances that are hot or irritate the skin are
being metered.
Protect yourself by wearing protective clothing, safety goggles, breathing apparatus.
Inform the safety and environmental protection officer(s).
Keep a suitable collection container close at hand.
Be careful! Danger of death!
Made sure that the drive unit has been switched off or disconnected. Make sure that
the equipment has been switched off before work starts and that precautions have
been taken so that it cannot start up again unintentionally. Inform the appropriate
control staff.
Page 8 of 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents