Installing a CAP H
Connect the MAINS Power and Power on a DC CAP H
This section provides information for powering a DC CAP H. If you are installing an AC CAP H, go to
"Connect the MAINS Power and Power on an AC CAP H" on page
The MAINS cable must be properly secured observing local regulations and electrical codes. Be sure to
allow enough slack in the cable at the CAP H to mount or dismount the cable into the DC MAINS connector
of the CAP H.
A CAP H requires M6 double-lug DC cable connectors with stud-holding spacing of 15.88 mm (5/8"), as shown
in
Figure
8.
™
CommScope Era
High Power Carrier Access Point Installation Guide — Preliminary
Page 44
Figure 8. Required M6 Double-Lug DC Cable Connectors
42.
15.88 mm
(5/8")
M6
M0201AKB_uc
© January 2019 CommScope, Inc.