Connect the earth-bonding cable as shown in the graphic to the right.
2
Loosen the hex nut, and then connect the earth-bonding cable between the two washers.
a
Refasten all parts by tightening the hex nut.
b
Connect the other end of the earth-bonding cable to a suitable permanent ground.
c
M8x30 set screw
Ground of a second unit in a cascade must be connected to the same equipotential bonding terminal as
the Primary CAP H. Use bonding cables of the same length, as short as possible, and with a large wire cross
section. Follow local electrical code practices.
M0201AKB_uc
© January 2019 CommScope, Inc.
Locking ring
M8 Hex nut
Earth-Bonding cable
CommScope Era
Flat washers
Contact washer