2. Install the pressure pickup tubes on the top of the extension in the IT racks identified in step 1.
•
Use two hose clamps to install each tube.
•
Orient the hose barb toward the HPE Adaptive Rack Cooling System that is cooling that rack.
NOTE: The barbs on the hose must face toward the HPE Adaptive Rack Cooling System.
You might need to bend the assembly up slightly for IT clearance on installation.
•
Position port holes horizontally with one side facing the IT rack and the other side facing the
extension.
Configuration
23
Need help?
Do you have a question about the Adaptive Rack Cooling System and is the answer not in the manual?
Questions and answers