HPE Adaptive Rack Cooling System configured between four IT racks with the pressure tubes
installed on the furthest outboard IT racks on either side
HPE Adaptive Rack Cooling System configured at one end of two IT racks
NOTE: For this special installation, join hose barbs together and install them only on the farthest rack
from the HPE Adaptive Rack Cooling System (left rack in this illustration). Purchase an extra Y-
connection for this installation.
22
Configuration
Need help?
Do you have a question about the Adaptive Rack Cooling System and is the answer not in the manual?
Questions and answers