Q3 ENERGIE QX3 Series Installation And Operating Instructions Manual page 40

Table of Contents

Advertisement

Installation and operating instructions
QX³ series
Assembling the PV plug-in connector:
No.
1
2
3
4
5
Opening the PV plug-in connector /
removing the cable:
No.
1
2
3
4
5
_____________________________________________________________________________________________
Q3 ENERGIE Installation and operating instructions QX³ series
Version 1.0, Stand 27.04.2015
Action
Open the spring with a screwdriver.
Insert the stripped core with its twisted wires carefully until it will go no further.
You must be able to see the wire ends in the spring.
Press down the spring. Make sure the spring has snapped into place.
Push the insert into the sleeve.
Tighten the screw connection with a torque of 2 Nm.
Action
Unscrew the screw connection of the cable.
Release the DC plug-in connector by prying open the clip mechanism on the side with
a screwdriver.
Pull the DC plug-in connector apart.
Release the clamping spring by prising open the clamp.
Remove the PV cable.
40/109

Advertisement

Table of Contents
loading

Related Products for Q3 ENERGIE QX3 Series

Table of Contents