Q3 ENERGIE QX3 Series Installation And Operating Instructions Manual page 37

Table of Contents

Advertisement

Installation and operating instructions
QX³ series
AC mains plug QX³10000-18000:
Pos
Meaning
A
Cable gland
AC plug connector housing
B
C
4 x screws for the contact insert
D
Contact insert
E
Contact insert (opened)
NOTE
AC connections work steps:
No.
1
2
3
4
5
6
7
_____________________________________________________________________________________________
Q3 ENERGIE Installation and operating instructions QX³ series
Version 1.0, Stand 27.04.2015
The cable gland seals the housing against
humidity and relieves the cable from
mechanical stressing.
Action
Observe the technical connection requirements (TAB) of the power supply company!
Check the supply voltage and compare it with the inverter type plate.
Switch off the DC switch disconnecter on the inverter
Prepare the AC grid cable as shown
Connect the AC grid cable and / AC power plug as shown (observe and verify the
rotating field).
Connect the AC power plug to the inverter and screw in place.
Check that all cables are firmly attached.
37/109

Advertisement

Table of Contents
loading

Related Products for Q3 ENERGIE QX3 Series

Table of Contents