Maintenance; Shelf Light Bulb Replacement; Periodic Maintenance; Cleaning Condenser Coil - FEDERAL INDUSTRIES SSRSP Series Installation & Operation Instructions

Refrigerated sandwich prep case models
Table of Contents

Advertisement

MAINTENANCE

Shelf Light Bulb Replacement

1. All shelf light fixtures use a spring-loaded socket at one end. To remove the bulb push the bulb
towards the spring-loaded socket until the opposite ends drops out of the socket.
2. The bulb is inside a clear shatter proof tube with a black plastic cap on each end. Be careful not to
allow bulb to slide out of shatter proof tube.
3. Reinstall new bulb in to the existing shatter proof tube and reuse black plastic end caps. Reinstall
bulb assembly in the same manner as described in the Bulb Removal Procedure. Be sure bulb is
secure in bulb receptacles
Note: Be sure to use a direct equivalent to the original bulb.

PERIODIC MAINTENANCE

NOTICE:
Cleaning Condenser Coil (All Self Contained Refrigerated Units)
It is very important that the Condenser coil is cleaned twice per month to insure proper refrigeration
performance and to prevent compressor failure. Failure to clean condenser coil will void condenser
warranty.
1. Disconnect power to the unit.
2. Remove the back base panel located on the back bottom of unit by removing the (6) front panel
retaining screws.
3. Carefully vacuum the front surface of condenser coil. Take care not to bend coil fins with vacuum
cleaner nozzle.
4. Reinstall back panel and retaining screws.
(6) REAR BASE
PANEL SCREWS
Condenser coil must be cleaned a minimum of twice per month to insure
proper refrigeration performance and prevent compressor failure.
Failure to clean condenser coil will void condenser warranty.
- 20 -
VACUUM FRONT
SURFACE OF
CONDENSER COIL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssrsp5952Ssrsp5052Ssrsp7752

Table of Contents