Figure 5. Chassis Installed in a 2-Post Rack

Installing the Chassis in a Four-Post Rack

You can install the C9010 chassis in a 4-post round- or square-hole rack by following the tool-less
procedure in this section or in a 4-post threaded-hole rack by following a tooled procedure. The
illustrations in this section show how to install the chassis in a 4-post square-hole rack using a tool-less
procedure.
WARNING: Use an equipment lift or pallet jack when lifting or moving the chassis. Install the
chassis into the rack before inserting the chassis components. Lift the C9010 chassis only from
the bottom. Lifting by the chassis shelves or power supply openings might damage the chassis.