Nibe SMO 40 User Manual page 30

Control module
Hide thumbs Also See for SMO 40:
Table of Contents

Advertisement

Schedule: The schedule to be changed is selected here.
Activated: Scheduling for the selected period is activated here. Set times are
not affected at deactivation.
Day: Select which day or days of the week the scheduling is to apply to here.
To remove the scheduling for a particular day, the time for that day must be reset
by setting the start time to the same as the stop time. If the row "all" is used, all
days in the period are set according to that row.
Time period: The start and stop time for the selected day for scheduling are se-
lected here.
Adjustment: Here, you schedule when cooling will not be permitted.
Conflict: If two settings conflict with each other, a red exclamation mark is dis-
played.
VENTILATION (ACCESSORY REQUIRED)
Menu
1.3.3
Increases or decreases in the ventilation to the accommodation can be scheduled
here for up to two time periods per day.
30
Chapter 3 | SMO 40 – at your service
TIP
If you wish to set similar scheduling for every day of the week start
by filling in "all" and then changing the desired days.
TIP
Set the stop time earlier than the start time so that the period extends
beyond midnight. Scheduling then stops at the set stop time the day
after.
Scheduling always starts on the date that the start time is set for.
NIBE SMO 40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents