Siemens CP 1243-8 IRC Operating Instructions Manual page 34

Simatic net s7-1200 telecontrol
Table of Contents

Advertisement

LEDs and connectors
2.2 LEDs
DIAG
LINK
(red / green)
(red / green)
-
green
-
flashing
green
-
flashing
green
-
flashing
green
VPN connections
-
-
-
-
-
-
Loading firmware
flashing green
flashing
flashing green
green (2x)
flashing red
flashing green
* With configured dial-up network connections, a connection is shown as being established or the partner as being reacha-
ble if the connection has been established and least once and then not aborted.
34
CONNECT
VPN
ETH
(green)
(green)
-
-
-
-
-
-
-
CONNECT
Meaning
RS232
(if more than one point listed: alternative
(green)
meaning)
Configuration of the telecontrol communica-
tion via both interfaces error-free and ena-
bled.
At least one connection established on eve-
ry interface but not all.
Configuration of the telecontrol communica-
tion via both interfaces error-free and ena-
bled. No connection established
Configuration of the telecontrol communica-
tion via both interfaces error-free and ena-
bled.
Connection established via Ethernet to at
least one partner.
No connection established via the serial
interface.
Configuration of the telecontrol communica-
tion via both interfaces error-free and ena-
bled.
Connection established via the serial inter-
face to at least one partner.
No connection established via Ethernet.
-
All configured VPN connections are estab-
lished.
-
Not all configured VPN connections are
established.
-
No VPN connection configured on the CP.
Loading firmware. The "DIAG" LED flashes
alternately red and green.
Firmware was successfully loaded. Die LED
"DIAG" flashes green twice.
Error loading the firmware
Remedy: Power OFF → ON
Operating Instructions, 06/2015, C79000-G8976-C385-01
CP 1243-8 IRC

Advertisement

Table of Contents
loading

Table of Contents