System Requirements; System Inventory - AFWFilters Fleck 5600 Installation Instruction

Table of Contents

Advertisement

S
R
YSTEM
EQUIREMENTS
Your chosen installation location and water supply must meet ALL of the following
requirements:
20-90 PSI (1.38-6.20BAR)
34-110°F (1.1-43.3°C)
System must be protected from freezing
Firm level surface AFTER the pressure tank
3-prong, 120V outlet within 5 ft. (1.5 m) of the control head
with constant power. GFCI outlet is recommended. Use of an
extension cord is NOT recommended.
A 1.5 inch standpipe, sump pit, or outside drain. Please note:
The drain line is pressurized and can be ran vertically if
necessary.
1—V
S
ERIFY
YSTEM
Use the following table to help verify the parts that are included with your system and
verify that they are all accounted for. Inspect all parts for damage and report any
damage immediately. DAMAGE CLAIMS MUST BE MADE WITHIN 30 DAYS OF
DELIVERY TO BE ELIGIBLE FOR REPLACEMENT.
I
NVENTORY
2 of 28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fleck 5600sxt

Table of Contents