Mounting Instructions - ABB REACT 2 Quick Installation Manual

Solar inverters 3.6 to 5.0 kw
Hide thumbs Also See for REACT 2:
Table of Contents

Advertisement

6. Mounting Instructions (continuation)
•   Remove the protective cover from the connec-
tor of the Wi-Fi antenna
part of the REACT2-UNO
antenna (supplied inside the REACT2-UNO box)
by screwing it into the specific connector.
•   Make the electric connections using personal protec-
tive clothing and/or equipment, such as insulating
gloves.
•   Proceed with installation of the ABB energy meter.
7. Mounting Instruction - multi battery systems
The underlying procedure is related to the side-by-side installation of REACT2-BATT. Alternatively, is possible to install the REACT2-
BATT separately and at greater distances using the "REACT2-XL-CABLE-KIT" cable kit (2 meter cables length).
•   Position the REACT2-BATT bracket
REACT2-BATT so that it is perfectly level on the wall and use
it as a drilling template. To aling the brackets of the two
REACT2-BATT (in case of side-by-side installation) use the
reference point and follow the steps as in the picture.
•   It is the installer's responsibility to choose an appropriate type
of screw anchors for the attachment points. The choice must be
based on the type of support (wall, frame or other support), the
type of anchors to be used, and their ability to support 4 times the
inverter's weight (4x50Kg=200Kg).
Depending on the type of anchor chosen, drill the re-
quired 2 holes
B
to mount the bracket.
•   Depending on the type of anchor chosen, drill the re-
quired 2 holes
to mount the bracket.
B
•   Fix the REACT2-BATT bracket
•   Lift the REACT2-BATT up to the bracket and insert the heads of
two anchor points (present on the back of the battery unit) into
the slots
on the bracket
Risk of injury due to the heavy weight of the
equipment.
•   Hang up the lower part of the REACT2-BATT to the wall using
the two wall attachment point
Click
•   I nstall an earth cable between the protective grounding connection points on the two REACT2-BATTs
To execute all external grounding connection, follow the procedure described below:
1. From among the components supplied, find the M5 nut, M5 flat washer and M5 serrated lock washer and two cable lugs.
Make a jumper earth cable using the two cable lugs supplied (minimum cross-section not less than 4mm²). The cable must be long enough to connect the
REACT2-BATT external protective earth [B]
2. Connect the cable on REACT2-BATT external protective earth [B]
3. Connect the other side of the cable on REACT2-BATT external protective earth [A]
- For both connection follow the below installation sequence
Installation sequence:
knurled washer
grounding jumper (one side)
Flat washer
M5 nut (torque of 4.1 Nm)
22
located on the lower
02
and install the Wi-Fi
20
of the second
to the support.
20
20
.
26
(holes diameter 11 mm).
Click
Click
Click
24
to the REACT2-BATT external protective earth [A]
22
2 x
B
•   R emove the caps from the battery units connectors.
- To remove the battery signal connectors
pull it.
- To remove the battery power connectors
latch (highlighted in red) and pull it off.
•   Connect the two battery cables between inverter and
battery unit (supplied inside the REACT2-BATT box).
•   Give each cable a pull test to confirm the connection is
secure.
25
.
of the first REACT2-BATT installed.
24
.
25
25
- 9 -
9 mm
Ø
20
B
21
EN
22
02
08 22
simply
09 23
press the
24

Advertisement

Table of Contents
loading

Table of Contents