Installing The Thermostatic Mixer - Mira MYLINE Installation & User Manual

Thermostatic mixer
Table of Contents

Advertisement

Installing the Thermostatic Mixer

1. The thermostatic mixer must be fitted vertically
as illustrated and can only be installed with
rear supply inlets. The supply pipework must
be connected as follows:
Cold to Top Inlet
Hot to Bottom Inlet
Bottom Outlet.
Important! This product does not allow for
reversed inlets.
2. Determine the route for the hot and cold supply
pipework.
Important! Make sure that there is sufficient
headroom and ceiling clearance to install the
integral slidebar.
Cold
Outlet
3. Loosen the 2 backplate grubscrews with the
2 mm hexagonal key (supplied) and pull the
mixer and concealing plate from the backplate.
4. Unscrew the inlet nuts from the backplate.
Hot
5. Using the backplate as a guide, mark the
8
Backplate
Inlet Nuts
Grubscrew
positions of the fixing holes and the pipe
centres.
Important! Make sure that there is sufficient
headroom and ceiling clearance to install the
integral slidebar.
Note! Make sure that the backplate is the
correct way up (refer to illustration).
Large boss must be
fitted at the bottom
Concealing
Plate

Advertisement

Table of Contents
loading

Table of Contents