Maintenance - TECO E510s Series Instruction Manual

Hide thumbs Also See for E510s Series:
Table of Contents

Advertisement

5.5 Maintenance

To ensure long-term reliability, follow the instructions below to perform regular inspection.
Turn the power off and wait for a minimum of 5 minutes before inspection to avoid potential
shock hazard from the charge stored in high-capacity capacitors.
1. Maintenance Check List:
Ensure that temperature and humidity around the inverters is as required in the
instruction manual, installed away from any sources of heat and the correct
ventilation is provided..
For replacement of a failed or damaged inverter consult with the local supplier.
Ensure that the installation area is free from dust and any other contamination.
Check and ensure that the ground connections are secure and correct.
Terminal screws must be tight, especially on the power input and output of the
inverter.
Do not perform any insulation test on the control circuit.
2. Insulation test Method
Single Phase:
Three Phase:
L1(L)
Power
Inverter
L2
Source
L3(N)
Dielectric
Withstand
Voltage Test
L1(L)
Power
Inverter
L2
Source
L3(N)
Dielectric
Withstand
Voltage Test
5-25
T1
T2
Motor
T3
T1
T2
Motor
T3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents