Before You Begin

FIGURE 1 Contents of the rack mount kit
Before You Begin
Before installing and setting up the controller, Ruckus Networks recommends that you first complete the following pre-
installation tasks.

Prepare the Required Hardware and Tools

NOTE
At the beginning of each procedure, this guide lists the specific tools, accessories, or equipment that you will need to
complete that procedure.
You must supply the following tools and equipment:
A switch or router for connecting the controller to the backbone network. If you purchased SKU P01-S124-WW10 (see
Determine Which Controller SKU You Have
recommends using a switch or router that has 10GbE interfaces.
A Phillips #1 screwdriver
A flat head screwdriver
An administrative computer (desktop or laptop) running Windows 8/7/Vista/XP or Mac OS X, containing a minimum RAM
of 15G, with a web browser installed (Google Chrome recommended). Supported web browsers include:
Google Chrome 15 (and later)
Safari 5.1.1 (and later)
Mozilla Firefox 8 (and later)
Microsoft Internet Explorer 9.0
A grounded electrical power strip or surge suppressor to protect from circuit overload
A standard EIA 19-inch wide rack with an available 1RU space
12
on page 13), which has two (2) 10GBASE-X (SFP+) ports, Ruckus Networks
Ruckus SmartZone 100 Getting Started Guide, 5.1.1