Fit excess electric cable and Di2 Junction A or SRAM BlipBox
inside stem cover, positioning LEDs at lens. Slide end cap down
to snap into place.
20
MECHANICAL CABLE ROUTING
It is recommended that front and rear derailleur cables be installed after the brake hose has been installed. These routing illustrations are intended as a supplement
to the manufacturer's installation instructions only. Please refer to the component manufacturer's service center or website for further information.