Nameplate; Flue Systems - Buderus Logano plus SB615 Installation And Servicing Instructions

Condensing boiler for operation with fanassisted gas burner
Table of Contents

Advertisement

7
Installation
7.5

Nameplate

Attach paper rating plate (Fig. 22, Item 1) to left or
right side panel according to boiler room situation.
NOTICE:
The metal boiler plate is attached to the steel
boiler vessel behind the left front jacket pan-
el.
7.6

Flue systems

The flue gases produced must be transported to the
outside via flue pipes and chimney flues.
Building code approved, moisture and condensate re-
sistant flue pipes and chimney flues must be used.
Before commissioning the heating system, check that
the flue system used is suitable for the boiler.
Follow guidelines in planning instructions.
Check the flue connection for leaks.
Follow the installation instructions of the flue system
manufacturer.
20
Fig. 22
Item 1: Rating plate
Logano plus SB615 - Technical specifications are subject to change without prior notice.
Attach paper rating plate
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents