Maintenance; Routine Maintenance Procedures; Battery; Replacing The Ac Fuses - CareFusion Alaris Gateway Workstation Directions For Use Manual

Table of Contents

Advertisement

Maintenance

Routine Maintenance Procedures

To ensure that this Workstation remains in good operating condition, it is important to keep it clean and carry out the routine
maintenance procedures described below . All servicing should only be performed by Qualified Service Personnel with reference to the
Technical Service Manual (TSM 1000SM00015) .
Circuit diagrams, components parts lists and all other servicing information which will assist the Qualified Service Personnel in
performing repair of the parts designated as repairable, are available upon request from CareFusion .
If the Workstation is dropped, damaged, subjected to excessive moisture or high temperature, immediately take it
A
out of service for examination by Qualified Service Personnel.
All preventative and corrective maintenance and all such activities shall be performed at a compliant work place in
accordance with the information supplied. CareFusion will not be responsible should any of these actions be
performed outside the instructions or information supplied by CareFusion.
Interval
Routine Maintenance Procedure
When loading Pumps
Check that each Pump is properly located on the MDI and is mechanically locked into position .
When removing Pumps Check that the MDI Warning LED turns off when the Pump is removed . If the LED stays on, the Workstation
should be serviced by Qualified Service Personnel .
As per Hospital Policy
Thoroughly clean external surfaces of the equipment before and after prolonged periods of storage .
At least once per year
• Inspect AC outlets, communication connectors and the AC inlet for damage .
(Refer to TSM for
• Perform electrical safety checks . The complete unit leakage current must be measured . If more than 500µA
identification of parts)
the equipment should not be used, but should be serviced by Qualified Service Personnel .

Battery

It is recommended that only Qualified Service Personnel replace the battery, using only a CareFusion recommended battery . For further
information regarding the replacement of batteries refer to the Technical Service Manual .
The battery pack used in this Alaris Gateway Workstation is manufactured by CareFusion and includes a proprietary PCB (printed
circuit board) designed specifically for the Alaris Gateway Workstation, and in conjunction with Alaris Gateway Workstation software,
controls battery use, charge and temperature . Any use of battery packs that are not manufactured by CareFusion in the Alaris Gateway
Workstation is at your sole risk, and CareFusion does not provide any warranty for or endorsement on any battery packs that are not
manufactured by CareFusion . CareFusion's product warranty shall not apply in the event the Alaris Gateway Workstation has suffered
damage or premature wear, or malfunctions or otherwise operates incorrectly, as a result of use with a battery pack that is not
manufactured by CareFusion .

Replacing the AC Fuses

If the AC power indicator does not illuminate when the Workstation is connected to the AC power supply, either the power supply fuse in
the AC plug or, the AC fuses of the Workstation have blown .
First check the power supply fuse in the AC plug, if the AC power indicator does not illuminate proceed to check the Workstation AC
fuses . Switch the power off and disconnect the Workstation from the AC power supply .
It is recommended that only Qualified Service Personnel replace the AC fuses . For further information regarding the replacement of
internal AC fuses refer to the Technical Service Manual .
If the fuses continue to blow, suspect an electrical fault and have the Workstation and power supply checked out by
A
Qualified Service Personnel.
1000DF00742 Issue 2
Alaris™ Gateway Workstation v1.2
27/30
Maintenance

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alaris v1.2

Table of Contents