Operation Of Workstation; Switching On; Switching Off; Resetting The Workstation - CareFusion Alaris Gateway Workstation Directions For Use Manual

Table of Contents

Advertisement

Operation of Workstation

Switching On

After initially switching on the Workstation, any services and applications running on the Workstation may take up to 90 seconds to
become fully operational .
1 . Connect the AC power cord from the AC supply to the AC power inlet socket on the Workstation .
2 . Verify the AC Power indicator is illuminated .
3 . Optional: Verify the network cable is attached to the port denoted by the xxx symbol if connection to PDMS is required
4 . Press the
a
key once to switch the Workstation on .
Start Up Sequence Steps
5 . Start of Workstation power on
6 . Bar code reader test
7 . Pump Alarm Location Beacon test,
where fitted .
8 . Initialization of each tile
9 . Nurse call test, when connected
10 . Windows CE software start-up
11 . Initialization of the Workstation internal
network
12 . System initiates the power on Self-test
13 . Test of internal systems
14 . Power on of workstation complete
Caution:
Do not switch off the Workstation during this initial 90 second period.
Caution:
If any of the verification checks fails when the Workstation is switched on, suspect a fault. Remove the Workstation
from service and contact Qualified Service Personnel.

Switching Off

Press the
a
key and hold for two seconds to switch the Workstation off .

Resetting the Workstation

In the unlikely event that the Workstation needs to be reset, press and hold the
Indicator is extinguished, release the key then press again to switch the Workstation back on .
Caution:
If the Workstation still fails to operate correctly after resetting, remove the Workstation from service and contact
Qualified Service Personnel.
Resetting the Workstation is also required to clear any System Fault Indicator.
A

Fitting an Auxiliary Workstation

1 . Start with both the primary Workstation (option 2 and 3) and the auxiliary Workstation (option 1) powered off .
2 . Connect the auxiliary connector (red ethernet port) on the auxiliary Workstation to the auxiliary connector on the primary
Workstation using the ethernet cable supplied with the auxiliary Workstation .
a
3 . Press the
key once, on the primary Workstation, to switch the Workstation on .
4 . Wait till the primary Workstation has completed the power up sequence and tile registration beep sounds .
5 . Press the
a
key once, on the auxiliary Workstation, to switch the auxiliary Workstation on .
Primary Workstation
ON status indicator is illuminated
The red LED on the barcode reader (where
fitted) is briefly illuminated and the
barcode reader emits a beep .
Verify the Pump Alarm Location Beacon
(where fitted) illuminates red then amber
and is then extinguished .
Verify the System Fault indicator
illuminates briefly, emits a series of beeps
and is then extinguished .
Nurse call automatically activated
Verify the Workstation emits a brief audible
tone .
The A and B Status indicators will flash
after a long beep
Verify the System Fault indicator
illuminates briefly and is then
extinguished .
Beep emitted from the second speaker
Verify the ON status indicator is
illuminated .
1000DF00742 Issue 2
Alaris™ Gateway Workstation v1.2
User Verification
Auxiliary Workstation
ON status indicator is illuminated
Not applicable
Verify the Pump Alarm Location Beacon
(where fitted) illuminates red then amber
and is then extinguished .
Verify the System Fault indicator
illuminates briefly, emits a series of beeps
and is then extinguished .
Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
Verify the ON status indicator is
illuminated .
a
key for at least four seconds until the ON Status
19/30
Operation of Workstation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alaris v1.2

Table of Contents