Installation Procedures; Prepower Check; Power On Check; Completion Of Installation - IBM 5100 Maintenance Information Manual

Hide thumbs Also See for 5100:
Table of Contents

Advertisement

(
(
:r
(
\
/
Installation Procedures
IBM 5100 PORTABLE COMPUTER
Prepower Check
Check with the customer to verify that the AC voltage
outlet is grounded properly.
Power On Check
1.
2.
3.
4.
5.
6.
Make sure that the POWER switch is off.
Connect the mainline cord to the AC power outlet.
Turn the POWER switch on.
Observe the 5100 Portable Computer for signs of
overheating or smoke. Turn off the POWER
switch immediately if any abnormal conditions are
noted.
Check that the fan is turning.
Use the MACHINE CHECKOUT, MAP 0900, to
check the 5100 Portable Computer Operation and
performance.
Completion of Installation
The 5100 Portable Computer serial number is engraved
on the rear of the base.
Fill out the IR form and report the installation according
to local procedures.
Cover Cleaning
Use a mild soap or isopropyl alcohol (part 2200200).
DO NOT use IBM cleaning fluid.
Appendix B
IBM 5100 Portable Computer Specifications
Dimensions:
Inches
Millimeters
Weight:
Heat Output/hr:
F
S
17.5 24.0
H
8.0
445 609.6
203
50 pounds (24 kg)
780 Btu
Power Requirements:
AC Voltage
(single phase)
Hertz
kVA
100 V
100 V
115
V
220
V
235
V
50
60
60
50
50
0.4
0.4
0.4
0.4
0.4
Power Cord Specifications (220, 235):
Cable
00 -
0.4:t 0.015 inches (10.16:t 0.38 mm)
Shields - none
Conductors - 3
Conductor size - 16 Awg (1.3 mm
2 )
IBM 5103 PRINTER
Refer to the IBM 5103 Printer Maintenance Information
Manual, SY31-0414 for the 5103 installation procedures.
Installation Procedures
8-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents