Appendix A: List Of Test Sequences That Include Multiple Tests - Motorola System 6300 Service Manual

Table of Contents

Advertisement

APPENDIX A:
LIST OF TEST SEQUENCES THAT INCLUDE MULTIPLE TESTS
System 6300 test sequences are predefined combinations of tests
and subtests.
The System 6300 diagnostic test sequences include
three sequences that run multiple tests and subtests.
appendix lists the tests and subtests that execute in these
sequences.
Default Test Sequence (d)
The following tests execute in the default test sequence (d):
1.
Memory Read, Write, and Refresh Test
2.
Map Translation Test
3.
Page Fault Test
4.
Parity Test
5.
Map RAM Test
6.
User I/O Error Test
7.
Clock Test
8.
RS-232-C (8274) Test
9.
Fast Communication Port Test.
Functional Verification Test Sequence (v)
The functional verification test sequence (v) executes all tests
included in the d test sequence (see above) except the fast
communication port test and plus subtests 3 and 5 of the disk
test.
The v test sequence executes with disk ignore mode enabled
and with default values so the operator does not have to be
present to press the RETURN key to continue the tests.
Complete System Test Sequence (s)
The system verification test sequence (s) requires two systems to
execute.
In addition to all tests included in the d test
sequence (see above), this test sequence executes the disk test.
The s test sequence should be executed with disk ignore mode
enabled and with default values so the operator does not have to
be present to press the RETURN key to continue the tests.
This
A—1

Advertisement

Table of Contents
loading

Table of Contents