Cisco Firepower 2100 Series Hardware Installation Manual page 9

Hide thumbs Also See for Firepower 2100 Series:
Table of Contents

Advertisement

Overview
Figure 2: Firepower 2110 and 2120 Package Contents
1
3
5
7
9
The following figure shows the package contents for the Firepower 2130 and 2140. The contents are subject
to change and your exact contents will contain additional or fewer items depending on whether you order the
optional parts. See
2130 and 2140 package contents.
Firepower 2110 or 2120 chassis
1 power cord (country-specific)
2 rack-mount brackets and six 8-32,
0.281-in. screws
Cable management bracket kit
2 cable management brackets and four 8-32
x 0.375-in. screws
(Optional; in package if ordered)
Rack-mount screws:
• Four 12-24, 0.75 in.
• Four 10-32, 0.75 in.
• Four M6, 19 mm
Product ID Numbers, on page 30
2
Blue console cable PC terminal adapter
4
SFP transceiver
(Optional; in package if ordered)
6
1 ground lug kit
#6 AWG lug, two 10-32 x .38-in. screws
8
2 user documents:
• Useful Links Cisco Firepower 2100
Series document
• Start Here document
for a list of the product IDs (PIDs) associated with the
Cisco Firepower 2100 Series Hardware Installation Guide
Package Contents
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents