Firing Rates; Test Boiler; Commercial Boilers - Riello RL 22 BLU Installation, Use And Maintenance Instructions

Light oil burners, two stage operation
Table of Contents

Advertisement

Available languages

Available languages

RL 22 BLU
RL 32 BLU
B
- Reduced firing rate for applications in Switzerland (according to LRV ʻ92)
(A)
(B)
150 mm MAX
(C)
D2987
(D)
D1819
A
B
A
B
6
FIRING RATES (A)
The burners can work in two ways: one-stage
and two-stage.
1st stage DELIVERY must not be lower than the
minimum limit in the diagram.
2nd stage DELIVERY must be selected within:
• Area A for applications in accordance with EN
267;
• Area B for applications in accordance with
LRVʼ92.
This area provides the maximum delivery of the
burner in relation to the pressure in the combus-
tion chamber.
kg/h
Important:
kW
the FIRING RATE area values have been ob-
tained considering a surrounding temperature of
20 °C, and an atmospheric pressure of 1000
mbar (approx. 100 m above sea level) and with
the combustion head adjusted as shown on page
8.
Note:
If burner RL 32 BLU fails to reach the maximum
prescribed delivery in area A, we recommend re-
moving the shutter screwed onto the air damper.
See figure (D).
TEST BOILER (B)
The firing rates were set in relation to special test
boilers in accordance with the methods defined
in EN 267 standards.
Figure (B) indicates the diameter and length of
kg/h
the test combustion chamber.
kW
Example
Delivery 16 kg/hour:
diameter = 40 cm, length = 1 m.
Whenever the burner is operated in a much
smaller
commercially-available
chamber, a preliminary test should be per-
formed.
COMMERCIAL BOILERS (C) -
The burners are designed exclusively for com-
bustion chambers with flue gas outlet from the
bottom (for example three flue gas passes), ac-
cessible via the door.
Max thickness of the frontal boiler wall: 150 mm.
D814
D1863
combustion
Important

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Rl 32 blu964 t2965 t2

Table of Contents