Configuration Verification - ABB Pluto Series Integration Manual

Table of Contents

Advertisement

6.6 Configuration Verification

The configuration can be verified with the "bw" command, see below
dnet_gw> bw
-----------------------------
DeviceNet bus status.
-----------------------------
Node number : 3 [0x3]
Bus speed
: 250 kbits
Bus power
: VALID
Bus status
: OFFLINE
-----------------------------
Current setup done by PLC system.
Input
assembly 1 = PLUTO Data Only
Output assembly 1 = To PLUTO Data
Expected PLUTO 00-15 : 00 01 02 03 -- -- -- -- -- -- -- -- -- -- -- --
Expected PLUTO 16-31 : -- -- -- -- -- -- -- -- -- -- -- -- -- -- 30 31
Enabled To PLUTO package 0-3 : 0 1 2 3 , Timeout 1000 ms .
-----------------------------
dnet_gw>
Don't forget to document the configuration by copy/past the terminal text to a configuration
document for use if new gateway needs to be configured.
[102]
[113]
25
2TLC172011M0205_B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pluto b20Gate-d2Gate-d1

Table of Contents